Three versions, one bank, zero excuses. Real4dumps offers the AACE-PSP materials as a printable PDF, an interactive Windows software engine, and an online version for any device — the same expert-verified AACE International Planning & Scheduling Professional (PSP) content everywhere you study.
AACE International AACE-PSP Exam Overview:
| Certification Vendor: | AACE International |
|---|---|
| Exam Name: | Planning & Scheduling Professional (PSP) Exam |
| Exam Number: | AACE-PSP |
| Available Languages: | English |
| Related Certifications: | Cost Engineering Professional (CEP) Total Cost Management (TCM) Professional |
| Certificate Validity Period: | 5 years |
| Exam Format: | Memo writing assignment, Scenario-based questions, Multiple-choice |
| Real Exam Qty: | 119 + 1 memo assignment |
| Exam Duration: | 300 minutes |
| Exam Price: | USD 395 (Members) / USD 495 (Non-Members) |
| Passing Score: | 70% |
| Recommended Training: | AACE PSP Review Course AACE PSP Certification Study Guide |
| Exam Registration: | AACE International Certification Portal |
| Sample Questions: | ![]() |
| Exam Way: | Online proctored or in-person at authorized testing centers |
| Pre Condition: | Minimum 8 years of professional experience; or 4 years experience + 4 years of relevant college degree |
| Official Syllabus URL: | https://web.aacei.org/certification/psp |
AACE International AACE-PSP Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Communication Competency | - Written analysis and recommendation through memo assignment | |
| Conduct Planning Duties | 30% | - Planning standards, methodologies and best practices - Activity duration estimating techniques - Project scope definition and work breakdown structure - Activity definition, sequencing and logical network development - Resource planning and allocation |
| Conduct Scheduling Duties | 70% | - Schedule development and calculation (CPM, PDM, PERT) - Schedule compliance, validation and documentation - Schedule risk analysis and contingency planning - Schedule updating, progress measurement and forecasting - Resource-constrained scheduling and leveling - Schedule analysis, optimization and what-if scenarios |
AACE-PSP Exam Prep: Tools, Policies, and Support
AACE International lists the following prerequisites for the AACE International Planning & Scheduling Professional (PSP): Minimum 8 years of professional experience; or 4 years experience + 4 years of relevant college degree.
Verify the current requirements on the official certification page before registering.
Registration runs through the official channels below:
Choose your test center or online session and book early — a fixed date turns intention into schedule.
The AACE International Planning & Scheduling Professional (PSP) blueprint is organized around these main domains:
- Conduct Planning Duties (30%)
- Communication Competency
- Conduct Scheduling Duties (70%)
Per the latest exam information, the AACE-PSP exam contains 119 + 1 memo assignment questions and allows 300 minutes minutes. The software and online engines let you rehearse under those exact conditions.
Clear and confirmed. If you fail the corresponding exam within 60 days of purchase, send your failure score report to our support email together with a scanned copy of your enrollment slip — the official Score Report PDF must reach us within two days of the exam date. Once confirmed, we process the full refund within seven days. Exclusions: exams taken within three days of purchase, candidate names that differ from the payer, and free or expired products. Alternatively, exchange your product for two others of equal value at no cost.
AACE International recommends these official training resources:
Structured training plus mistake-tracking engine practice covers both knowledge and technique.
Upon successful payment, our system automatically emails the product to your mailbox — typically within about a minute — with an instant download link on screen. If nothing arrives within two hours, check your spam folder and contact us. From the date of purchase you hold a 365-day service warranty: our IT colleagues check update information every day, and whenever the bank is revised, we send you the download email for reference. Renew beyond the year at a 50% discount.
Currently, the AACE-PSP exam requires a passing score of 70%, and the registration fee is USD 395 (Members) / USD 495 (Non-Members). Both figures belong to AACE International and can change, so confirm them on the official site when you book.
Match the tool to your habits. The PDF version suits paper lovers: read online or print out for handwritten practice. The software version suits Windows users: interactive and functional, it reminds you of good study methods and easy memorization — and it remembers your mistakes after each session, prompting repeated practice until they stick. The online version carries the same functions to every operating system and device, so you can read, write, and recite anytime, anywhere. Whichever you choose, every answer is expert-verified, customer service is online 24/7, your information stays secret under a strict protection system — no advertisement emails — and returning customers enjoy loyalty discounts.
AACE International Planning & Scheduling Professional (PSP) Sample Questions:
If Activity A was delayed 5 days from starting, which of the following adjustments will NOT maintain the completion date of Activity C at Day 40?
- A. Reduce the duration of B" from 10 days to 5 days by compressing work effort
- B. Replace the relationship from 'B' to 'C' with SSO
- C. Reduce the duration of 'A' from 20 days to 10 days and replace the relationship from B' to 'C with FSO.
Correct Answer: C 🗳️
Explanation: Only visible for Real4dumps members. You can sign-up / login (it's free).
What method offers the best chance of the schedule being used effectively to implement the project in the field?
- A. Allow large time contingencies on milestones and completion deadlines.
- B. Issue detailed schedule updates as frequently as possible.
- C. Obtain consent and agreement to the schedule from the key project personnel.
- D. Include detailed and stringent set of scheduling specifications in the contract.
Correct Answer: C 🗳️
Explanation: Only visible for Real4dumps members. You can sign-up / login (it's free).
Which of the following is NOT true?
- A. Constraints can interfere with the longest path calculation.
- B. Multiple calendars can affect the total float calculation.
- C. Remaining durations can exceed original durations.
- D. A network must contain only one Critical Path.
Correct Answer: D 🗳️
Explanation: Only visible for Real4dumps members. You can sign-up / login (it's free).
Under which circumstance should one perform resource-leveling calculations?
- A. When the schedule is resource-loaded.
- B. When the contract contains a provision for float-banking.
- C. When you believe that known resource limitations may override schedule logic.
- D. Never, unless required by the contract.
Correct Answer: C 🗳️
Explanation: Only visible for Real4dumps members. You can sign-up / login (it's free).
Using the "normal" schedule, theoretically construct a hammock for activities 2001 through 2004. What is the duration of the hammock?
- A. 53 days
- B. 145 days
- C. 91 days
- D. 183 days
Correct Answer: A 🗳️
Explanation: Only visible for Real4dumps members. You can sign-up / login (it's free).






