NEW QUESTION 22
Identify the purpose for creating Bills of Material
There are 3 correct answers to this question.
Response:
- A. Costing bill of material
- B. Processing
- C. Production bill of material
- D. Structuring
- E. Design bill of material
Answer: A,C,E
NEW QUESTION 23
For which business requirements must you use serial numbers?
There are 2 correct answers to this question.
Response:
- A. To have a future option to track material items as pieces of equipment
- B. To have the option to track batches
- C. To have a future option to track material items as pieces of functional locations
- D. To uniquely identify inventory material items
Answer: A,D
NEW QUESTION 24
You customize an order type to release orders immediately upon creation, and you assign the order type to a maintenance item.
How can a user override the automatic release of the order without creating a new order type?
- A. Set the Do Not Release Immediately indicator in planning data for the maintenance item.
- B. Set the Do Not Release Immediately indicator in the task list header.
- C. Select a maintenance activity type and set the Do Not Release Immediately indicator.
- D. Select a maintenance planner group and set the Do Not Release Immediately indicator.
Answer: A
NEW QUESTION 25
Which configuration represents how the back-end is cabled on an SC7020 storage array without expansion enclosures?
- A.

- B.

- C.

- D.

Answer: C
NEW QUESTION 26
What does the functional location category determine? (Choose two)
- A. Whether a fixed asset from Asset Accounting can be assigned
- B. Whether you can create linear data for a functional location
- C. The functional location class
- D. The partner determination procedure
Answer: B,D
NEW QUESTION 27
Which steps must you perform to activate the usage history for equipment? (Choose two)
- A. Activate the usage history for the equipment category.
- B. Activate the usage history for each piece of equipment in the master record.
- C. Set the Usage History indicator for the maintenance plant.
- D. Define history-related fields for the relevant equipment reference category.
Answer: A,D
NEW QUESTION 28
Your customer wants to utilize estimated costs in Plant Maintenance orders.
Which condition does the customer need to be aware of?
- A. Planned costs overwrite estimated costs after release of the order.
- B. Planned costs must not exceed the estimated costs.
- C. A specific order type in which cost estimates are activated must be used.
- D. Upon release of the order, estimated costs cannot be revised.
Answer: D
NEW QUESTION 29
An SC9000 controller was rebooted to test failover and is back online. Do the controllers need to be rebalanced?
- A. No; this is done automatically as part of the reboot process in DSM
- B. No; they are automatically rebalanced on the SC9000
- C. Yes; this can be done from the Summary, Storage, or Hardware tab in DSM
- D. Yes; however, the other controller needs to be rebooted first
Answer: C
NEW QUESTION 30
What all are the steps take part in external work center.
There are 2 correct answers to this question.
Response:
- A. Order
- B. Structure
- C. Process
- D. Technical completion
- E. Notify
Answer: A,D
NEW QUESTION 31
What are the purposes of technical object structures? (Choose three)
- A. To enable detailed cost analyses
- B. To display the total number of an asset's individual parts from a design engineering perspective
- C. To collect historical data for maintenance objects
- D. To support Asset Accounting in the description of fixed assets
- E. To identify objects and object parts for maintenance
Answer: A,C,E
NEW QUESTION 32
A maintenance work order has external processing. The planning plant and maintenance plant have different addresses. A purchase requisition is generated from a maintenance order.
With standard delivered SAP Customizing, which address is the default delivery address in the purchase requisition?
- A. Work center
- B. Maintenance plant
- C. Storage location
- D. Planning plant
Answer: D
NEW QUESTION 33
Your customer wants to assign maintenance orders to network activities automatically with the
Maintenance Event Builder (MEB).
Which of the following steps must you perform?
There are 2 correct answers to this question.
Response:
- A. Assign a network to a revision with revision type WPS-controlled.
- B. Assign a hierarchical task list to a notification.
- C. Set the define Transfer of Project or Invest Program indicator.
- D. Assign maintenance orders manually to a revision with revision type WPS-controlled.
- E. Assign the Reference PM/PS element to task list headers and network activities.
Answer: A,E
NEW QUESTION 34
For what maintenance manager is responsible.
Please choose the correct answer.
Response:
- A. Defining, controlling and triggering the budget planning process
- B. Multiple tasks
- C. None of the above
- D. Execute the planning process
Answer: A
NEW QUESTION 35
What does the functional location category determine?
There are 2 correct answers to this question.
Response:
- A. Whether a fixed asset from Asset Accounting can be assigned
- B. Whether you can create linear data for a functional location
- C. The functional location class
- D. The partner determination procedure
Answer: B,D
NEW QUESTION 36
What do you need to select when creating a maintenance plan that only generates notification(s)?
- A. A specific notification type that includes a task list.
- B. A specific maintenance strategy for notifications.
- C. A maintenance plan category for notifications.
- D. A specific notification type for maintenance plans.
Answer: C
NEW QUESTION 37
In a refurbishment order for external processing, where can you find information about the defective part after the goods issue has been posted?
- A. In special stock type F (customer order stock)
- B. In special stock type R (refurbishment stock), after the return from the service company and a goods receipt posting
- C. In special stock type O (parts provided to vendor)
- D. In special stock type B (batch) after the return from the service company and a goods receipt posting
Answer: C
NEW QUESTION 38
Your customer executes deadline monitoring (transaction IP30).
What happens after you insert additional call dates using the manual call function?
Please choose the correct answer.
Response:
- A. The system restarts the maintenance plan.
- B. The system retains the normal scheduled call dates.
- C. The system reschedules all previous scheduled call dates.
- D. The system fixes the next scheduled call date.
Answer: B
NEW QUESTION 39
Which of the following combinations must you use to create a single-cycle maintenance plan for an external service?
- A. A framework order and a maintenance order for settlement
- B. A maintenance order for settlement and an outline agreement
- C. A framework order and a subcontract purchase order
- D. A subcontract purchase order and an outline agreement
Answer: A
NEW QUESTION 40
When a user creates a task list using the Copy function, all the header fields transfer to the new task list, with one exception.
Which field is the exception?
- A. Usage
- B. Status
- C. Work Center
- D. Assembly
Answer: B
NEW QUESTION 41
To which maintenance object types can you link a priority type?
There are 2 correct answers to this question.
Response:
- A. The combination of the order category and order type
- B. The order type only
- C. The notification type only
- D. The combination of the notification category and notification type
Answer: B,D
NEW QUESTION 42
What happens when you set the system status in a maintenance order to technically completed (TECO)?
(Choose two.)
- A. The system sets a deletion indicator for outstanding reservations.
- B. The system posts costs to the target account assignment.
- C. The system sets a deletion indicator for purchase orders assigned to the maintenance order.
- D. The system sets a deletion indicator for outstanding purchase requisitions.
Answer: A,D
NEW QUESTION 43
What are the three organizational levels? (Choose three.)
- A. Assign
- B. Analyze
- C. Damage
- D. Define
- E. Collect
Answer: A,B,D
NEW QUESTION 44
Your customer wants to establish a maintenance work center with various activity types, each with a different fixed price.
How do you accomplish this?
- A. Create various maintenance activity types in each work center and assign a price.
- B. Create various maintenance activity types with the fixed prices and assign them to the work center.
- C. Define the activity types for each maintenance planning plant.
- D. Define the activity types in Controlling and assign them to the cost center of the work center.
Answer: D
NEW QUESTION 45
Name the data which is created during the monitoring, controlling, regulation and optimization of a technical process.
Please choose the correct answer.
Response:
- A. Document entry
- B. WAMP
- C. Measurement system
- D. Process control system
Answer: D
NEW QUESTION 46
What step activates the Warranty subscreen as part of the equipment master data record?
- A. Setting the Use-in-Equipment indicator in the Master Warranty transaction
- B. Adding the Warranty subscreen in View Profiles for Technical Objects
- C. Setting the Master Warranty indicator in the equipment master data
- D. Adding the Warranty subscreen in the Object Information view of the equipment master data record
Answer: B