NEW QUESTION 48
Which time elements does MRP consider in backward scheduling to determine the order dates for components from dependent requirements? Note: There are 2 correct answers to this question.
- A. Total replenishment lead time
- B. In-house production time
- C. Planned delivery time
- D. Operation duration
Answer: B,C
NEW QUESTION 49
In which of the following master data objects can you define the production order default storage location for a material component?
There are 2 correct answers to this question.
Response:
- A. Material master of the finished product
- B. Routing, in the component allocation
- C. BOM, in the item for the material
- D. Work center, in the production supply area
Answer: C,D
NEW QUESTION 50
In which data objects do you maintain the production line as the work center for repetitive manufacturing?
Note: There are 2 correct answers to this question.
- A. Repetitive manufacturing profile
- B. Routing
- C. Production cost collector
- D. Production version
Answer: B,D
NEW QUESTION 51
The SAP Kanban procedure could be used to trigger which of the following kinds of replenishment?
There are 2 correct answers to this question.
Response:
- A. Vendor consignment
- B. In-house production
- C. Subcontracting
- D. Stock transfer
Answer: B,D
NEW QUESTION 52
Which advanced functionality has been embedded in SAP S/4HANA?
There are 3 correct answers to this question.
Response:
- A. Backorder processing
- B. Supply Network Planning
- C. Available-to-promise
- D. Capacity planning
- E. Demand planning
Answer: A,C,D
NEW QUESTION 53
What is the difference between co-products and by-products?
- A. Only co-products are identified by a special item category in the bill of material (BOM).
- B. Only co-products appear in the process or production order settlement rule.
- C. Only by-products have a zero inventory valuation.
- D. Only co-products can be manufactured in isolation from the main product.
Answer: B
NEW QUESTION 54
Which time elements are part of a routing operation? Note: There are 3 correct answers to this question.
- A. Float before production
- B. Pick/pack time
- C. Queue time
- D. Wait time
- E. Move time
Answer: B,C,D
NEW QUESTION 55
If you use floats to limit dispatching in capacity planning, what type of time element can be reduced by strategy settings while dispatching?
- A. Production time
- B. Minimum wait time
- C. Queue time
- D. Goods receipt processing time
Answer: C
NEW QUESTION 56
Your company produces a finished good based on a forecast and expects it to being stock when customers order it. If customers order more than the forecasted quantity, the production quantity should be increased to try to meet the extra demand. Which planning strategy do you use?
- A. Make-to-order production (20)
- B. Make-to-stock production (10)
- C. Planning with final assembly (40)
- D. Planning without final assembly (50)
Answer: C
NEW QUESTION 57
How does the new Inventory Management Data model contribute to the reduction of the data footprint?
There are 3 correct answers to this question.
Response:
- A. By eliminating material master tables
- B. By eliminating inventory history tables
- C. By eliminating hybrid tables
- D. By eliminating fields for different stock types
- E. By eliminating inventory tables
Answer: B,D,E
NEW QUESTION 58
Your production planners must execute planning only for specific resources. How can you achieve this in Advanced Planning (PP"/OS)?
- A. Use a resource group.
- B. Use a propagation range.
- C. Use a heuristic.
- D. Use a planning group.
Answer: C
NEW QUESTION 59
Which functional capabilities does the Detailed Scheduling Board have?
There are 2 correct answers to this question.
Response:
- A. Enter time-ticket confirmation for production orders
- B. Undo for drag & Drop planning activities
- C. Change sales order quantities
- D. Change planned order quantities
Answer: B,D
NEW QUESTION 60
A warehouse manager likes to streamline the goods receipt (GR) process for production orders. Where can you enable the automatic GR?
There are 2 correct answers to this question.
Response:
- A. Confirmation profile
- B. Production scheduling profile
- C. Operation control key
- D. Scheduling margin key
Answer: B,C
NEW QUESTION 61
How can you limit the number of master data objects to be created when the manufacturing process is the same for many different products?
Please choose the correct answer.
Response:
- A. By creating routings with alternative sequences
- B. By creating routings with parallel sequences
- C. By assigning the same production version to different materials
- D. By assigning different materials to the same routing
Answer: D
NEW QUESTION 62
For a production version to be valid and consistent what requirements must be fulfilled? Note: There are 3 correct answers to this question.
- A. The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
- B. The deletion flag must NOT be set for the bill of materials (BOM) or the routing.
- C. The assigned routing must NOT have alternative sequences.
- D. The lot size range must be within the lot-size range of the assigned routing.
- E. The assigned routing must be a rate routing.
Answer: A,B,D
NEW QUESTION 63
The material master of your finished product contains MRP type "PD". You set a manual firming date in the stock requirements list. Which of the following will firm planned orders" There are 2 correct answers to this question.
Response:
- A. Creating a planned order within the planning time fence
- B. Setting a planning time fence in the Material Master Record
- C. Assigning a production scheduling profile
- D. Manually changing the quantity of a planned order
Answer: A,B
NEW QUESTION 64
You want to reduce planning efforts for B/C materials. Which planning procedure do you recommend?
- A. Material requirements planning
- B. Consumption-based planning
- C. Manual planning without check
- D. Forecast planning
Answer: B
NEW QUESTION 65
Which elements are included in the structure of the batch where-used list?
There are 3 correct answers to this question.
Response:
- A. Stock transfers
- B. Collective orders
- C. Transfers from batch to batch
- D. Planned orders
- E. Purchase orders
Answer: A,C,E
NEW QUESTION 66
Which of the following is an advantage of MRP Live and NOT available in classical MRP?
Response:
- A. MRP Live can create production orders automatically
- B. MRP Live can propose alternative solutions
- C. MRP Live can priorities demand from sales orders
- D. MRP Live can plan materials with recursive BOMs
Answer: B
NEW QUESTION 67
Which options do you have to plan both quant ties and capacities during line loading in repetitive manufacturing? Note: There are 2 correct answers to this question.
- A. Assign planned orders manual lying the planning table.
- B. Run MRP with quota arrangement.
- C. Run PP/DS heuristics for repetitive manufacturing.
- D. Run MRP with automatic selection of production version.
Answer: B,C
NEW QUESTION 68
What determines whether the planned independent requirements in MRP consume other requirements?
- A. Consumption sequence procedure
- B. Requirements type
- C. Requirements profile
- D. Order type
Answer: B
NEW QUESTION 69
......