The "SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing" certification exam validates that the candidate possesses the fundamental and core knowledge required of the SAP S/4HANA Manufacturing consultant profile. This certification proves that the candidate has an overall understanding and in‐depth technical skills to participate as a member of a project team in a mentored role.

 

NEW QUESTION 27
Which SAP solutions support the supplier area in the portfolio of the Digital Value Network? Note: There are
3 correct answers to this question.

  • A. SAP Field glass
  • B. SAP SuccessFactors
  • C. SAP Ariba
  • D. SAP C/4HANA
  • E. SAP Concur

Answer: A,C,E

 

NEW QUESTION 28
What does the bill of material usage (BOM usage) control at the BOM item level?
Response:

  • A. Maximum allowed low-level code
  • B. Default values for the item status
  • C. Allowed material type
  • D. Default unit of measure

Answer: C

 

NEW QUESTION 29
What determines whether the planned independent requirements in MRP consume other requirements?

  • A. Requirements profile
  • B. Consumption sequence procedure
  • C. Order type
  • D. Requirements type

Answer: D

 

NEW QUESTION 30
Which warehouse management functions are available in SAP EWM but NOT in SAP WM?
There are 3 correct answers to this question.
Response:

  • A. Expected goods receipt
  • B. Yard Management
  • C. Handling Unit Management
  • D. Labor Management
  • E. Slotting

Answer: A,D,E

 

NEW QUESTION 31
Which materials have a negative quantity in a bill of materials or in a recipe? Note: There are 3 correct answers to this question.

  • A. Bulk materials
  • B. By-products
  • C. Waste products
  • D. Continuous flow materials
  • E. Co-products

Answer: B,C,E

 

NEW QUESTION 32
In a production process, you need a certain amount of liquid as input material. The source tank is directly connected to the reactor. How can you process consumption postings?

  • A. Backflushing
  • B. Transfer Order
  • C. Kanban
  • D. Picking list

Answer: D

 

NEW QUESTION 33
If you use floats to limit dispatching in capacity planning, what type of time element can be reduced by strategy settings while dispatching?

  • A. Production time
  • B. Queue time
  • C. Minimum wait time
  • D. Goods receipt processing time

Answer: B

 

NEW QUESTION 34
In Make-to-order production, which field controls whether the components will be planned as sales order specific stock?
Please choose the correct answer.
Response:

  • A. The Planning Strategy of the finished product
  • B. The item category of the component in the BOM
  • C. The Individual/Collective indicator of the component
  • D. The MRP Type of the component

Answer: A

 

NEW QUESTION 35
How can you set up the supply source for the SAP Kanban process? Note: There are 3 correct answers to this question.

  • A. Using purchasing costs for automated source prioritization
  • B. Using quotations for internal and external procurement
  • C. Using stock transfer reservations for stock transfer
  • D. Using run schedule quantities for in-house production
  • E. Using purchase orders for external procurement

Answer: C,D,E

 

NEW QUESTION 36
How can you limit the number of master data objects to be created when the manufacturing process is the same for many different products?
Please choose the correct answer.
Response:

  • A. By creating routings with alternative sequences
  • B. By assigning the same production version to different materials
  • C. By assigning different materials to the same routing
  • D. By creating routings with parallel sequences

Answer: C

 

NEW QUESTION 37
In the Manage Shortage view of the new SAP Fiori app "Monitor Material Coverage", what do the stars indicate?
Please choose the correct answer.
Response:

  • A. The presence of firmed planned orders
    Visit us athttp://examcertify.com/C_TS422_1909.html
  • B. The presence of production orders
  • C. The priority of the proposed solution
  • D. The viability of the proposed solution

Answer: D

 

NEW QUESTION 38
What are main innovations in manufacturing in SAP S/4HANA?
There are 3 correct answers to this question.
Response:

  • A. Flow manufacturing
  • B. Monitor Production Orders Fiori app
  • C. Lock-free inventory movements
  • D. Material Coverage Fiori app
  • E. Rough-cut capacity planning

Answer: B,C,D

 

NEW QUESTION 39
To ensure that the warehouse operator only stages large components in the exact required quality for each production order, which warehouse material staging method would you recommend?
Please choose the correct answer.
Response:

  • A. Pick parts
  • B. Release order parts
  • C. Kanban
  • D. Crate parts

Answer: A

 

NEW QUESTION 40
How can SAP S/4HANA support a GMP compliant production process? Note: There are 3 correct answers to this question.

  • A. Recipe approval (with Engineering Change Management)
  • B. Use of the GMP compliant flag in relevant master data applications
  • C. Documentation of quality data with Quality Management
  • D. Predefined GMP compliant process order types to meet audit requirements
  • E. Use of the digital signature function to check and run business processes

Answer: A,C,E

 

NEW QUESTION 41
In the Manage Shortage view of the new SAP Fiori app "Monitor Material Coverage", what do the stars indicate?
Please choose the correct answer.
Response:

  • A. The presence of production orders
  • B. The presence of firmed planned orders
  • C. The priority of the proposed solution
  • D. The viability of the proposed solution

Answer: D

 

NEW QUESTION 42
You produce your material based on a forecast derived from historical sales and expect it to be in inventory when your customer orders. If customers order more that the forecasted quantity, you want to increase production to try to meet the extra demand.
Which is the appropriate planning strategy to use?
Response:

  • A. 20 - Make to order production
  • B. 10 - Anonymous make-to-stock
  • C. 50 - Planning without final assembly
  • D. 40 - Planning with-final-assembly

Answer: D

 

NEW QUESTION 43
Which document is skipped when SAP EWM is embedded in SAP S/4HANA?
Please choose the correct answer.
Response:

  • A. Warehouse order
  • B. Outbound delivery order
  • C. Outbound delivery request
  • D. Warehouse task

Answer: C

 

NEW QUESTION 44
......


SAP C_TS422_1909 Certification Exam Topics:

Topic AreasTopic Details, Courses, Books
Production Orders in SAP S/4HANA > 12%

Determine BOM item category, describe order status management and set user statuses, configure availability check for components, trigger routing selection, set up an order type, apply material staging and confirmation.

Process Orders in SAP S/4HANA < 8%

Characterize process order elements and process order processing, determine master data objects for process orders, identify features for Good Manufacturing Practices (GMP).

Advanced Planning in SAP S/4HANA > 12%

Outline the basics and master data of advanced planning,  explain tools (alert monitor, detailed scheduling planning board) and advanced planning and detailed scheduling processes, explain planning evaluation concepts

Introduction to SAP S/4HANA Supply Chain Planning < 8%

Outline both motivation and background of SAP S/4HANA, describe its main components, the lines of business, and the SAP User Experience strategy.

Demand Management in SAP S/4HANA < 8%

Explain and compare the different production methods in make-to-order, make-to-stock, and assembly planning.

Master Data in SAP S/4HANA > 12%

Identify and explain production relevant master data, including, but not limited to: bill of material, routing and production version.

Capacity Planning in SAP S/4HANA 8% - 12%

Outline best practices for using SAP S/4HANA, describe the SAP HANA database concept and new user experience with SAP Fiori, outline the capabilities of embedded analytics.

Introduction to SAP S/4HANA Production Planning < 8%

Outline production planning components and functions, differentiate consumption-based planning vs. MRP, outline new trends in production planning.

Lean Manufacturing in SAP S/4HANA 8% - 12%

Identify repetitive manufacturing specific master data, explain line load planning and confirmation, outline Kanban master data and Kanban processes.

Material Requirements Planning in SAP S/4HANA 8% - 12%

Select and apply planning strategies, use the planning table, characterize long-term planning and master production scheduling, outline MRP basics and steps of MRP, and describe lot size procedures.


 

C_TS422_1909 dumps - Real4dumps - 100% Passing Guarantee: https://www.real4dumps.com/C_TS422_1909_examcollection.html