NEW QUESTION 37
Your production planners must execute planning only for specific resources. How can you achieve this in Advanced Planning (PP"/OS)?
- A. Use a propagation range.
- B. Use a planning group.
- C. Use a heuristic.
- D. Use a resource group.
Answer: C
NEW QUESTION 38
What does the bill of material usage (BOM usage) control at the BOM item level?
Response:
- A. Default values for the item status
- B. Allowed material type
- C. Maximum allowed low-level code
- D. Default unit of measure
Answer: B
NEW QUESTION 39
In order to use strategy 70 - Planning At Assembly Level, what order field must be set besides the planning strategy?
Please choose the correct answer.
Response:
- A. Storage Location MRP Indicator
- B. Individual/Collective Indicator
- C. Mixed MRP indicator
- D. Dependent Requirements indicator
Answer: C
NEW QUESTION 40
What is SAP's strategic solution to perform Sales and Operations planning when you use SAP S/4HANA Manufacturing?
Please choose the correct answer.
Response:
- A. PP Standard Sales and Operations Planning
- B. APO Demand Planning
- C. Flexible Planning
- D. Integrated Business Planning
Answer: D
NEW QUESTION 41
Which of the following business processes are controlled by parameters that are dependent on production order type? Note: There are 2 correct answers to this question.
- A. Implementation
- B. Planning
- C. Engineering change management
- D. Inspection during production
Answer: A,B
NEW QUESTION 42
Your project team decides to use a make-to-order planning strategy for a strategic material in discrete manufacturing. What is the impact of this decision? Note: There are 3 correct answers to this question.
- A. Sales order-specific planning run is required.
- B. Sales order-specific stock is created
- C. Production orders are created with sales order reference.
- D. Storage location MRP areas are required.
- E. Net requirements calculation is sales order-specific.
Answer: B,C,E
NEW QUESTION 43
What do you use to schedule operations from planned orders so that the production plan can be fulfilled?
- A. Supply Network Planning (SNP)
- B. Capacity Requirements Planning (CRP)
- C. Material Requirements Planning (MRP)
- D. Demand Planning (DP)
Answer: C
NEW QUESTION 44
A planner wants to interactively resolve an overload situation on a resource using advanced planning tools without any automatic rescheduling activity by the system.
Which combination of settings for resource and detailed scheduling strategy are required to receive related alerts?
Response:
- A. Infinite resource and infinite strategy
- B. Infinite resource and finite strategy
- C. Finite resource and infinite strategy
- D. Finite resource and finite strategy
Answer: D
NEW QUESTION 45
MRP created a planned order for a material that has one single material from stock as a component. What happens to this dependent requirement when you convert the planned order into a production order?
- A. It is converted into a production order.
- B. It is converted into a planned order.
- C. It is converted into a reservation.
- D. It is converted into a schedule line.
Answer: C
NEW QUESTION 46
In Make-to-order production, which field controls whether the components will be planned as sales order specific stock?
Please choose the correct answer.
Response:
- A. The Individual/Collective indicator of the component
- B. The item category of the component in the BOM
- C. The MRP Type of the component
- D. The Planning Strategy of the finished product
Answer: D
NEW QUESTION 47
Which data object can be updated with the scheduling results of a routing?
Please choose the correct answer.
Response:
- A. Production version
- B. Production scheduling profile
- C. Material master
- D. MRP profile
Answer: C
NEW QUESTION 48
What are the three transition scenarios for an S/4HANA implementation?
There are 3 correct answers to this question.
Response:
- A. New implementation
- B. System conversion
- C. Landscape transformation
- D. System upgrade
- E. System activation
Answer: A,B,C
NEW QUESTION 49
What are attributes of the SAP S/4HANA Simplification list?
There are 3 correct answers to this question.
Response:
- A. It was created for better planning and estimation of your way to S/4HANA
- B. It is only a grouping of related technical simplifications
- C. It contains references to the relevant training material
- D. It details transaction and solution capabilities at a functional level
- E. It can have a business and a technical impact
Answer: A,D,E
NEW QUESTION 50
When do you use variant bills of materials (BOMB)?
- A. When multiple material also have the same BOM
- B. When a material has a configurable BOM
- C. When multiple material is have similar BOMB
- D. When a material has multiple BOMB
Answer: A
NEW QUESTION 51
Which elements are included in the structure of the batch where-used list?
There are 3 correct answers to this question.
Response:
- A. Purchase orders
- B. Collective orders
- C. Stock transfers
- D. Transfers from batch to batch
- E. Planned orders
Answer: A,C,D
NEW QUESTION 52
What Kanban status automatically posts goods receipt with reference to the procurement element?
Please choose the correct answer.
Response:
- A. Wait
- B. Empty
- C. In use
- D. Full
Answer: D
NEW QUESTION 53
Where does the system check master data selection settings during the creation of planned orders and production orders? Note: There are 3 correct answers to this question.
- A. In the production version
- B. In the production order type
- C. In the MRP controller
- D. In the routing
- E. In the bill of materials (BOM)
Answer: B,C,D
NEW QUESTION 54
What is the purpose of a reporting point confirmation in repetitive manufacturing? Note: There are 2 correct answers to this question.
- A. To determine the work in progress along the production line
- B. To reduce the total production lead time for along production line
- C. To provide timely updates of inventory management for the staged components
- D. To stage different components for a production line simultaneously
Answer: A,C
NEW QUESTION 55
What is the equivalent in SAP S/4HANA of the Production Data Structure in PP/DS?
There are 3 correct answers to this question.
Response:
- A. Engineering Change Record
- B. Bill of Material
- C. Routing
- D. Production Version
Answer: B,C,D
NEW QUESTION 56
The production plan is being disrupted by last minute demands that are entered in the system. Which is the most efficient way to handle last minute demands and protect the current production plan?
There are 2 correct answers to this question.
Response:
- A. In the material master record, set MRP type to P1 and a planning time fence on the replenishment lead time of the material
- B. Manually firm all planned orders for materials within the replenishment lead time of the material
- C. In the material master record, set MRP type to P4 and a planning time fence on the replenishment lead time of the material
- D. In the stock requirements list, set a manual firming fence for a date based on the replenishment lead time of the material
Answer: A,D
NEW QUESTION 57
In which data objects do you maintain the production line as the work center for repetitive manufacturing?
Note: There are 2 correct answers to this question.
- A. Production version
- B. Repetitive manufacturing profile
- C. Routing
- D. Production cost collector
Answer: A,C
NEW QUESTION 58
Which of the following processes lead to an entry in the MRP planning file? Note: There are 3 correct answers to this question.
- A. Creation of a purchasing contract
- B. Change of the storage bin
- C. Creation of dependent requirements
- D. Creation of a sales order
- E. Change of the material's procurement type
Answer: C,D,E
NEW QUESTION 59
An issue storage location was NOT found through the work center, bill of material (BOM)item, or material master. What determines whether the storage location can be derived from the production version?
- A. Plant Data
- B. MRP Controller
- C. MRP Group
- D. MRP Profile
Answer: C
NEW QUESTION 60
......