NEW QUESTION 133
Which of the following are the two sources of specifications?
- A. Standard specification & Engineering specification
- B. Seller specification & Standard specification
- C. Buyer specification & Standard specification
- D. Buyer specification & Buyer specification
Answer: C
NEW QUESTION 134
Economic regulation has centered on which of the following areas?
- A. All of the above
- B. Control of routes and service levels
- C. Control of market entry and exit
- D. Regulations of rates
Answer: A
NEW QUESTION 135
Which of the following are the purposes of material requirement planning so items in the master production schedule are made on time?
- A. To determine the quantities
- B. All of the above
- C. To determine the components needed
- D. To determine the due dates
Answer: B
NEW QUESTION 136
Which one of the following statements is about capacity requirements planning?
- A. Both A&B
- B. Involves translating monthly, quarterly or annual product priorities from the production plan into some total measure of capacity, such as gross labor house.
- C. This type of planning focuses on components parts, grater detail is involved than in roughcut capacity planning.
- D. It is directly liked to the material requirements plan
Answer: A
NEW QUESTION 137
The sum of the benefits the customer receives and can be more than the product itself is called:
- A. price
- B. quality
- C. value
- D. workforce
Answer: C
NEW QUESTION 138
Which forecast performance measure detects bias?
- A. tracking signal
- B. MAPE
- C. MAD
- D. standard deviation
Answer: A
NEW QUESTION 139
What is based on a comparative analysis of the introduction and growth of similar products in the hope that the new product behaves in a similar fashion?
- A. Historical analogy
- B. Future analogy
- C. Estimated analogy
- D. Forecasting analogy
Answer: A
NEW QUESTION 140
The order picker circulates throughout the warehouse selecting the items on the order through:
- A. Area system
- B. Zone system
- C. Pick and choose system
- D. Managing system
Answer: A
NEW QUESTION 141
What may vary depending upon the interest rates, the credit rating of the firm, and the opportunities the firm may have for investment?
- A. Item cost
- B. Capital cost
- C. Inventory cost
- D. Normal cost
Answer: B
NEW QUESTION 142
A company ships a particular product to a market located 1000 miles from the plant at a cost of $4 per mile. Normally it ships 500 units at a time. If the company can ship the units unassembled, it can ship 800 units in a truck. What is the line-haul cost per unit now?
- A. $4
- B. $8
- C. $5
- D. $10
Answer: C
NEW QUESTION 143
Which of the following are those of space and materials handling equipment?
- A. Equipment costs
- B. Material costs
- C. Capital costs
- D. Variance costs
Answer: C
NEW QUESTION 144
The flow of work centers must be planned to meet delivery dates which means production activity control must do the following:
- A. Schedule start and completion dates for each shop order at each work center so the scheduled completion date of the order can be met. This sill involves a planner in developing a load profile for the work centers.
- B. Ensure that the required materials, tooling, personnel and information are available to manufacture the components when needed.
- C. None of these
- D. Both of these
Answer: D
NEW QUESTION 145
An index of the relative priority of an order to other orders at a work center is referred to as:
- A. Aspect ratio
- B. Priority ratio
- C. Critical ratio
- D. Schedule ratio
Answer: C
NEW QUESTION 146
The movement and storage of finished goods from end of production to the customer is called:
- A. Physical supply
- B. Physical associate
- C. Physical distribution
- D. Physical channel
Answer: C
NEW QUESTION 147
An open order appears as a/an on the MRP.
- A. Open order file
- B. Order releases
- C. None of these
- D. Scheduled receipt
Answer: D
NEW QUESTION 148
is difference between the total planned for a given period and the
actual total for that period.
- A. Total control rate
- B. Collective concern
- C. Increasing rate
- D. Cumulative variance
Answer: D
NEW QUESTION 149
The files contained in the database are of two types which are:
- A. planning and control
- B. absolute and relative
- C. planning and procedural
- D. fixed and variable
Answer: A
NEW QUESTION 150
What determines the basic processes needed to convert the raw materials and components sinto the finished product?
- A. Process development
- B. All of the above
- C. Product's design
- D. Product's manufacturing
Answer: C
NEW QUESTION 151
Total customer satisfaction based on the complete experience with an organization, not just the product is known as:
- A. Total quality
- B. Perceived quality
- C. Absolute quality
- D. Fool proof quality
Answer: B
NEW QUESTION 152
MPS is meant to be:
- A. Depends on situation
- B. cyclic
- C. Flexible
- D. Rigid
Answer: C
NEW QUESTION 153
Which of the following is NOT the class of activity?
- A. Environment
- B. Operation
- C. Inspection
- D. Storage
Answer: A
NEW QUESTION 154
What serves as a means of identifying the product in a way not possible from its outward appearance?
- A. Container
- B. Frontier
- C. Boundary
- D. Package
Answer: D
NEW QUESTION 155
The advantage/s of production leveling is/are:
- A. All of these
- B. It results in smooth level off operation that avoids the costs of changing production levels.
- C. Firms do not need to have excess capacity to meet peak demand
- D. Firms do not need to hire and train workers and lay them off in slack periods
Answer: A
NEW QUESTION 156
shows the quantities needed and when manufacturing intends to make use or use them.
- A. Production plan
- B. Purchasing and production activity control
- C. MPS
- D. Material Requirement Plan
Answer: D
NEW QUESTION 157
The old saying "What you do not measure, you cannot control", is as valid today as it was when first stated. The necessary step/s in implementing a successful performance measurement program is/are:
- A. All of these
- B. State the measurement to be used, set performance standards, educate the user and make sure the program is consistently applied
- C. Define performance
- D. Establish company goals and objectives
Answer: A